Repair of the concrete floor of an apartment building car park to correct the falls. To ensure high-quality work, old and damaged concrete was milled off the substrate and the substrate was roughened. New falls were cast with a special flowable concrete designed for vehicle loads. The special rapid-setting BASF concrete repair mortars allow the repaired surfaces to be loaded just 2 hours after installation is completed.
Category: Concrete repair
Address: Pirita tee 20A
Completed in: 2019
Client: Nordecon AS