Stabilisation of the limestone foundation of Narva Estonian School using the wet-mix shotcrete technique.
The problem was that the building foundation needed underpinning, but due to the porous nature of the existing limestone foundation, excavation was not possible in one part of the building. The designer therefore specified strengthening of the foundation up to the first-floor ceiling with a reinforced 150 mm thick layer of shotcrete on both sides of the wall. Traveter Grupp OÜ carried out the strengthening of the foundation on the outside of the building. On the inside, where the wall was straight, it was more cost-effective to strengthen the wall with cast-in-place concrete.
Shotcrete was once again supplied by Rudus AS. Equipment was rented from Ramirent AS.
Category: Shotcreting
Address: Kraavi 3, Narva
Completed in: 2022
Client: Nordlin OÜ