Ilupilt

Car park concrete floor repair – Delta Plaza

Repair of the concrete floor of the Delta Plaza car park to correct the falls. To ensure high-quality work, old and damaged concrete was milled off the substrate and the substrate was roughened. New falls were cast with a special flowable concrete designed for vehicle loads. The works started on Friday evening and were handed over to the client around noon on Saturday. The special rapid-setting BASF concrete repair mortars allow the repaired surfaces to be loaded just 2 hours after installation is completed.

Category: Concrete repair
Address: Pärnu mnt 141, Tallinn
Completed in: 2020
Client: Kapitel AS

More projects completed in this category:

Buller