Waterproofing of inverted roofs.
Removal of existing soil from the roof of the reservoir.
Leveling of the substrate and installing the vapor barrier.
Construction of a fibrous concrete slab under waterproofing.
Installation of the cold-adhesive bitumen roll membrane.
Insulation and drainage mat installation.
Soil back and sowing grass.