Ilupilt

Reconstruction of the secondary clarifiers at Tallinn Wastewater Treatment Plant 2024

Our team reconstructed secondary clarifiers No. 1 and No. 2 at Tallinn Wastewater Treatment Plant. The work included repairing the edge of the drive wheel track base, where we cast a new track of grout concrete with very high compressive strength (102 N/mm²). We cleaned the walls and floor of the overflow channel of sediment and roughened the concrete with an ultra-high-pressure washer (over 2,000 bar). We then repaired and levelled the concrete surfaces with Sika MonoTop concrete repair mortars and coated the channel walls and floor with Sikagard®-7000 CR – a highly durable, elastic and easy-to-clean waterproofing system designed specifically for wastewater treatment plants, based on the innovative Xolutec® technology.

Materials were supplied by Primostar OÜ.

Category: Concrete repair/Wastewater facilities
Address: Paljassaare põik 14, Tallinn, Estonia
Completed in: 2024
Client: RVT Ehitus OÜ

More projects completed in this category:

Buller